Contact Us
Mobile:18032796331
Mobile:13739612731
Email:3916927@qq.com
Building 2, Area C, Fangyi Technology Park, High-tech Zone, Shijiazhuang City, Hebei Province
40/60 kW All-in-One Dual-Port DC Charging Pile
- Product Description
-
Technical Specifications
Power rating
40KW
60KW
Input voltage
304 - 465 VAC
304 - 465 VAC
Input frequency
45 - 65 Hz
45 - 65 Hz
Output voltage
304 - 456V DC
304 - 456V DC
Output power
40KW
60KW
Maximum current
DC120A
DC134A
Gun cable length
5M
5M
System efficiency
≥96%
≥96%
Protection Level
IP54
IP54
Power factor
≥0.99
≥0.99
Standard
CCS1, CCS2, GB/T, CHAdeMo
Auxiliary power supply
12V
12V
Startup Method
Scan the code, VIN, or password to charge.
Scan the code, VIN, or password to charge.
Communication Interface
4G, Ethernet
4G, Ethernet
Cooling method
Fan cooling
Fan cooling
Operating temperature
-30℃ - 55℃
-30℃ - 55℃
Relative humidity
5% - 95% non-condensing
5% - 95% non-condensing
Working Altitude
≤2000m
≤2000m
Protection Function
Overvoltage protection, undervoltage protection, overload protection, short-circuit protection, ground fault protection, surge protection, and leakage current protection.
Overvoltage protection, undervoltage protection, overload protection, short-circuit protection, ground fault protection, surge protection, and leakage current protection.
Overall dimensions
W×D×H 750×400×1600mm
W×D×H 750×400×1600mm
Charging Pile Installation Process
>> The concrete grade shall be no lower than C20; the underground portion shall have a height of no less than 400 mm, and the above-ground portion no less than 200 mm; the concrete foundation dimensions shall be 750 mm × 400 mm (length × width); the surface shall be intact, smooth, and free of cracks.
Cable Installation
Charging pile power
Recommended cable (copper) model mm²
Recommended cable (aluminum) model mm²
40kW Dual-Connector Integrated Charging Pile
YJV-3*25+2*16
YJV-3*35+2*16
60kW Dual-Connector Integrated Charging Pile
YJV-3*70+2*35
YJV-3*95+2*50
>> The communication input cable shall be routed starting from the user’s distribution switch and connected to the switch’s output terminals just before energization.
>>The distribution room shall be equipped with protection devices against overcurrent, short circuit, and lightning strikes.
>> On AC power lines, the colors yellow, green, red, and light blue correspond to AC phases A, B, C, and the neutral wire, respectively.
>> If the power cable is of a single color, a cable identification label must be affixed (or a labeled sleeve must be fitted).
>> AC power cables shall be routed separately from DC cables.
>> Power lines must not have any breaks, damage, or scratches.
>> The typical wiring sequence is to connect the protective earth first, followed by the neutral, and finally the AC phase conductors.
>> Before making electrical connections, ensure that all switches, fuses, and other protective devices are in the open (off) position.
Integrated Photovoltaic Storage and Charging Solution

Case Studies
Packaged Shipping
TAG:
Message
Contact
+8618132056806













