Contact Us
Mobile:18032796331
Mobile:13739612731
Email:3916927@qq.com
Building 2, Area C, Fangyi Technology Park, High-tech Zone, Shijiazhuang City, Hebei Province
40/60 kW Integrated Dual-Port DC Charging Station
- Product Description
-
Technical Specifications
Power rating
40KW
60KW
Input voltage
304 - 465VAC
304 - 465VAC
Input frequency
45 - 65 Hz
45 - 65 Hz
Output voltage
304 - 456V DC
304 - 456V DC
Output power
40KW
60KW
Maximum current
DC120A
DC134A
Gun cable length
5M
5M
System efficiency
≥96%
≥96%
Protection rating
IP54
IP54
Power factor
≥0.99
≥0.99
Standard
CCS1, CCS2, GB/T, CHAdeMo
Auxiliary power supply
12V
12V
Startup method
Scan the code, enter the VIN, and use a password to charge.
Scan the code, enter the VIN, and use a password to charge.
Communication interface
4G, Ethernet
4G, Ethernet
Cooling method
Fan cooling
Fan cooling
Operating temperature
-30℃ - 55℃
-30℃ - 55℃
Relative humidity
5% - 95% non-condensing
5% - 95% non-condensing
Operating altitude
≤2000m
≤2000m
Protection function
Overvoltage protection, undervoltage protection, overload protection, short-circuit protection, ground-fault protection, surge protection, and leakage protection.
Overvoltage protection, undervoltage protection, overload protection, short-circuit protection, ground-fault protection, surge protection, and leakage protection.
Overall dimensions
W×D×H 750×400×1600mm
W×D×H 750×400×1600mm
Charging Station Installation Process
>> The concrete grade shall be no lower than C20; the underground portion shall have a height of at least 400 mm, and the above-ground portion at least 200 mm. The concrete foundation dimensions are 750 mm × 400 mm (length × width), with a sound, smooth surface free of cracks.
Cable Installation
Charging pile power
Recommended cable (copper) model mm²
Recommended cable (aluminum) model mm²
40 kW dual-gun integrated charging station
YJV-3*25+2*16
YJV-3*35+2*16
60kW dual-gun integrated charging station
YJV-3*70+2*35
YJV-3*95+2*50
>> The AC input cable shall be routed starting from the user’s distribution switch and connected to the switch’s output terminals just before energization.
>>The distribution panel shall be equipped with protective devices against overcurrent, short circuit, lightning strikes, and other hazards.
>> On AC power lines, the colors yellow, green, red, and light blue correspond respectively to the AC phases A, B, C, and the neutral wire.
>> If the power cable is of a single color, a wire‑number label must be affixed (or a marked sleeve must be fitted).
>> AC power lines shall be routed separately from DC lines.
>> Power lines must not have any breaks, damage, or scratches.
The typical wiring sequence is: first the protective earth, then the neutral, and finally the AC phase conductors.
>> Before making electrical connections, ensure that all switches, fuses, and other devices are in the open position.
TAG:
Message
Contact
+8618132056806