Contact Us
Mobile:18032796331
Mobile:13739612731
Email:3916927@qq.com
Building 2, Area C, Fangyi Technology Park, High-tech Zone, Shijiazhuang City, Hebei Province
320/400 kW Integrated Dual-Port DC Charging Station
- Product Description
-
Technical Specifications
Power rating
320KW
400KW
Input voltage
304 - 465VAC
304 - 465VAC
Input frequency
45 - 68 Hz
45 - 68 Hz
Output voltage
50 - 1000V DC
50 - 1000V DC
Output power
Depending on the module configuration, output ranges from 40 kW to 320 kW.
Depending on the module configuration, output can range from 40 kW to 400 kW.
Maximum current
Single gun 250A, dual guns 500A
Single-gun 300A, dual-gun 600A
Gun cable length
7M
7M
System efficiency
≥96%
≥96%
Protection rating
IP54
IP54
Power factor
>0.99
>0.99
Standard
CCS1, CCS2, GB/T, CHAdeMo
Auxiliary power supply
12V, 24V (optional)
12V, 24V (optional)
Startup method
Scan the code, enter the VIN, and use a password to charge.
Scan the code, enter the VIN, and use a password to charge.
Communication interface
4G
4G
Cooling method
Independent airflow duct
Independent airflow duct
Operating temperature
-30℃ - 55℃
-30℃ - 55℃
Relative humidity
5% - 95% non-condensing
5% - 95% non-condensing
Operating altitude
≤2000m
≤2000m
Protection function
Overvoltage protection, undervoltage protection, overload protection, short-circuit protection, ground-fault protection, surge protection, and leakage protection.
Overall dimensions
W×D×H 950×800×1900mm
W×D×H 950×800×1900mm
Charging Station Installation Process
>> The concrete grade shall be no lower than C20; the underground portion shall have a height of at least 400 mm, and the above-ground portion at least 200 mm. The concrete foundation dimensions are 1150 mm × 1000 mm (length × width), with a sound, smooth surface free of cracks. Refer to the detailed external appearance below:
Cable Installation
Charging pile power
Recommended cable (copper) model mm²
Recommended cable (aluminum) model mm²
320kW dual-gun integrated charging station
YJV - 3*185 + 2*95
Two YJV - 3*240 + 2*120
400kW dual-gun integrated charging station
YJV - 3*185 + 2*95
Two YJV - 3*240 + 2*120
>> The AC input wiring shall be routed starting from the user’s distribution switch and connected to the switch’s output terminals just prior to energization.
>>The distribution panel shall be equipped with protective devices against overcurrent, short circuits, lightning strikes, and other hazards.
>> On AC power lines, the colors yellow, green, red, and light blue correspond respectively to the AC phases A, B, C, and the neutral wire.
>> If the power cable is of a single color, a wire‑number label must be affixed (or a marked sleeve must be fitted).
>> AC power lines shall be routed separately from DC lines.
>> Power lines must not have any breaks, damage, or scratches.
The typical wiring sequence is: first the protective earth, then the neutral, and finally the AC phase conductors.
>> Before making electrical connections, ensure that all switches, fuses, and other devices are in the open position.
Integrated Photovoltaic Storage and Charging Solution

Case Studies
Packaged Shipping
TAG:
Message
Contact
+8618132056806













